ATB Place Reimagined

Transforming an Edmonton landmark into a more vibrant, accessible, and future-ready destination.  

2025-2027

Why ATB Place Is Being Reimagined

ATB Place is undergoing a multi-year transformation that will modernize its spaces, improve accessibility, enhance experiences for tenants and visitors, and reinvigorate downtown Edmonton. Beginning in late 2025, construction will take place in carefully sequenced phases to minimize disruption while delivering a revitalized, community-oriented destination.  

Project Goals

Renew an iconic Edmonton property through future-forward design

Enhance public and tenant amenities

Improve accessibility, safety, and sustainability features

Celebrate the history and cultural significance of the site

Maintain continuous operations with minimal disruption

Strengthen trust through consistent, transparent communication with all stakeholders

At a Glance

  • Name: ATB Place Reimagined
  • Development Lead: Colliers 
  • Construction Partner: Chandos Construction
  • Construction Start: November 2025
  • Major Interior Phases: 2025–2027 
  • Projected Overall Substantial Completion: June 2027  
  • Full Completion: Fall 2027

PROJECT TIMELINE

  • Onsite signage, hoarding, and safety preparations 
  • Equipment arriving onsite
  • Initial hoarding installation
  • Staging, safety planning, restricted-access zones 
    (Minimal public/tenant impact expected) 
  •  

Concourse Level – Phase 1 Interior

  • November 2025 → September 2026 (~205 days)


Ground Floor – Phase 1 Interior
 

  • February 2026 → October 2026 (~160 days) 

Concourse Level – Phase 2 Interior 

  • September 2026 → May 2027 (~167 days)  
  • June 2027  


Fine Tuning & Adjustments
 

  • June 2027 → May 2028 

WHAT TO EXPECT DURING THIS PHASE

Colliers and our construction partners are entering the next phase of work. Here’s what tenants, visitors, and the public can expect:

Upcoming Activity 

  • Mobilization of equipment and materials 
  • Installation of hoarding on select levels 
  • Increased presence of construction teams 
  • Occasional noisy work 
  • Temporary re-routing inside the building where required 

Phasing Approach 

To maintain operations and public access: 
New areas will open before old areas are closed, allowing continuous use of the facility throughout construction. 

Expected Impact on Daily Operations 

  • Minimal interruptions expected 
  • Some occasional noise and dust may occur 
  • If you experience a disturbance, please notify your tenant support contacts 
  • Temporary closures will be communicated well in advance 


Safety & Accessibility Commitments
 

  • Clear signage and wayfinding 
  • Accessible alternative routes where needed 
  • Safety barriers and controlled site perimeters 

Tenant Information
& Updates

Construction Updates - What's Happening Now

Scheduled Work: October 30th – November 22, 2026 (estimate)

Location: South Tower Elevator Lobbies

Work will be commencing within the south tower main floor elevator lobbies. This phase of work involves the cleaning and restoration of the existing travertine finishes through a sandblasting process. Temporary closures of individual elevator banks and surrounding lobby areas will be required. All sandblasting activities will be completed after regular business hours to minimize disruption to building occupants. This work will be completed in four sequential phases, with each phase anticipated to take approximately one week.

To maintain safe and efficient movement throughout the lobby:

  • elevator banks will be addressed in phases
  • temporary rolling hoarding will be installed to isolate work areas and provide safe pedestrian routes
  • pedestrian circulation and access to elevators will be coordinated and adjusted as work progresses
  • directional signage will be provided to assist tenants and visitors navigate the temporary changes

 

October 2026 Updates

Current Activities:

  • Northwest Entrance – Temporary Access Changes: access through this entrance will continue to be maintained, however depending on the phase of work underway, only one of two sets of double doors may be operational at a time.
  • North Tower Exterior & Precast Panel Work: scaffolding, hoarding and other temporary protection measures remain in place and will be adjusted as work progresses. These safeguards separate construction activities from public areas.
  • North Tower Main Floor & Second Floor Hoarding: additional scaffolding has been positioned along the North Tower’s second level as interior demolition and exterior façade work progresses. Pedestrian routes will be adjusted around active construction zones.
  • South Tower Main Floor & Concourse Redevelopment: scaffolding and hoarding are now in place throughout portions of the South Tower’s main floor and Concourse to support construction throughout the future conference centre. Directional wayfinding signage will help tenants and visitors navigate the affected areas.
  • East Designated Smoking Area Closure: both smoking shelters have been consolidated and relocated to the southeast side of the building.
  • New Café Open: The new Roam café is now open and fully operational, providing tenants with an additional on-site food and beverage option.

Looking Ahead (current target dates remain subject to adjustment as construction advances):

  • South Tower – Wayfinding and Upcoming Elevator Lobby Improvements: hoarding surfaces throughout the South Tower will be painted and enhanced with vinyl graphics and updated wayfinding signage will be installed to improve navigation. Work on the elevator lobbies may require temporary access restrictions or closures to certain elevator banks.
  • Concourse Level – Public Washroom Closures and Temporary Facilities: the public washrooms on the concourse level and the washrooms within the Tenant Lounge will be temporarily closed to accommodate construction of new washroom facilities. Temporary washroom facilities for the Tenant Lounge will be provided for occupants. Additionally the concourse washrooms behind the North Tower elevators will remain available throughout the redevelopment.
  • North Tower Interior Lobby Access Hoarding: construction hoarding will extend approximately 10 feet into the existing corridor to accommodate work, while access to the North Tower will remain available through one set of double doors.

Tenant Support Channels

  • Tenant Advisory Committee (New):
    Svitlana Young — Svitlana.Young@colliers.com 
  • Property Manager:
    Svitlana Young — Svitlana.Young@colliers.com 

FAQ

ATB Place has been a cornerstone of downtown Edmonton for decades. This redevelopment ensures it remains competitive, accessible, and equipped with modern amenities for current and future tenants. The upgrades will improve comfort, energy efficiency, and the overall experience for everyone who works and visits here. We’re grateful for your role in making ATB Place what it is today, and what 100 Jasper will become. This project is for you — to ensure your workplace continues to evolve, inspire, and deliver the quality and experience you deserve.

Redevelopment will be completed in carefully planned phases between Fall 2025 and 2028. Each phase is designed to minimize disruption, and we’ll share regular updates so you always know what’s happening and when. 

The redevelopment will bring construction jobs, increase downtown foot traffic, and attract new tenants to Edmonton’s core. 

Colliers has a dedicated Tenant Liaison to ensure clear communication and relocation support where needed. 

Minimal impact is expected. Building access, amenities, and tenant suites will remain open throughout each phase. Any work that could cause disruption will be scheduled outside of business hours whenever possible.

Minimal disruption is expected; any changes will be communicated in advance. 

Please reach out to Tenant Services or the Property Manager immediately. 

Alternate paths may be introduced temporarily. Clear signage will be provided.

Some light construction noise may occur during specific phases, but every effort will be made to minimize disturbance. Hoarding and dust barriers will be used to maintain a safe and clean environment.

No significant interruptions are planned. All access routes, elevators, and parking areas will remain available. Should temporary adjustments be required, tenants will be notified well in advance.

Clear signage, hoarding, and designated work zones will ensure safety throughout the redevelopment. Contractors and staff follow strict safety and noise-control protocols.

Food services, parkade access, bike parking and other building amenities will remain operational. The following spaces will be temporarily closed to facilitate construction and upgrades: the fitness centre, the conference centre and the north escalator. Tenants will be notified before the temporary closures of other building amenities.

Massage and tailoring will continue to operate as usual. If short-term closures or relocations become necessary, tenants will receive advance notice and updated location details.

The Tenant Lounge will remain open, and programming will continue throughout the redevelopment. You can expect ongoing social events, workshops, and seasonal activities as part of our continued focus on connection and community within the building. If any scheduling changes occur, details will be shared in advance.

Yes. The redevelopment will deliver modernized tenant spaces, upgraded common areas, enhanced accessibility, and new sustainable features that improve overall comfort and efficiency. 

Media

For Journalists and Media Outlets 

NEWS, Events, & NOTICES

TREATY 6 ACKNOWLEDGEMENT

ATB Place is located on Treaty 6 Territory, the traditional lands of many First Nations, and the homeland of the Métis Nation of Alberta. 
We acknowledge this land and commit to honouring its history and peoples in our redevelopment efforts.

Contact Information

General Inquiries 

780-990-1768

Media

Pamela Smith
Pamela.Smith@colliers.com
1-604-692-1461

Emergency (after hours support)

ATB Place Security
780-408-1920